High energy costs and glassworks modernisation: why machines are being replaced faster

An IS machine may still meet its production plan while costing more to run than the original investment plan allowed for. The timing of a glassworks modernisation depends on measured consumption, contracted energy prices and other documented operating costs.

How energy prices change the economics of older machines

Glassworks managers often plan replacements around the technical condition of their equipment. A higher contracted electricity price, however, raises the cost of the same consumption. It is therefore worth reassessing the original modernisation date, even if the machine’s output has not changed.

Energy does not necessarily outweigh other operating costs at every glassworks. Its significance depends on the line’s consumption, the product range and purchasing terms. A machine that was economical under an earlier contract may now cost more to operate. If the difference in consumption is small, the original plan may still hold up.

Every year of delay has a cost, but that cost cannot be determined without data from the particular line. Compare the cost of continuing current operations with the option under consideration at the same production volume. The difference will show what a change in timing could mean. Without this comparison, a specific financial loss cannot be attributed to the delay.

For European context, consult Eurostat’s industrial electricity price data series. Before using it, check the available period, country and consumption band at the source. It provides a reference point, not a substitute for a glassworks’ contracted price.

You do not need to forecast future prices to make a decision. Check whether the original replacement date still makes economic sense under today’s contract and documented consumption. This gives the modernisation an economic basis rather than relying on a general assumption that energy will keep getting more expensive.

Why higher energy prices can shorten the payback period for replacement

The calculation starts with the difference in consumption between the existing and proposed machines. Relate that difference to actual operation and the price paid for energy. At a higher price, the same reduction in consumption has greater financial value. If other conditions remain comparable, the payback period for modernisation may shorten.

Comparability matters. A product changeover, a change in production volume or different operating hours can affect the result even without replacing the machine. Do not compare a new machine’s catalogue consumption figure with the electricity bill for an entire plant. First define the same part of the line, production programme and period for both options.

  • Electricity: compare consumption in kWh for a comparable product range and production volume.
  • Compressed air: record consumption in Nm³ and establish the cost of producing it.
  • Production basis: calculate consumption per 1,000 bottles; for a broader assessment of the line, you can use a tonne of melted glass.

A per-tonne calculation links consumption to production, but it does not separate the IS machine’s consumption from that of other equipment. Assess that separately. Nor should you multiply air consumption directly by the electricity price: the actual cost depends on how the compressor plant operates.

One replacement option to assess is the ISX servo IS machine. It is designed to use up to 50% less energy than conventional IS technology. Machine capacity is 30–220 tpd, depending on the project. That range alone, however, does not establish whether the machine is suitable for a particular line.

The stated reduction in energy use is not a measured result from your operation. For the investment calculation, use the existing machine’s consumption and a verified estimate for the proposed configuration. Include installation costs and the impact on production. Only then can you determine whether energy prices genuinely change the timing of the modernisation.

How an older machine affects other operating costs

Energy is not the only consideration. Repeated adjustments during product changeovers take up operators’ time. Downtime can disrupt the production plan, while rejected products can reduce the number of bottles sold. These costs cannot, however, be inferred from a machine’s age. Modernisation can reduce them only if they are linked to the equipment being replaced.

First, establish the cause of each loss. A defect may arise during forming or in downstream equipment. Not every line stoppage is IS machine downtime. Attributing every loss to one machine will overstate the benefit of replacing it.

  1. Adjustments: record the time operators spend on product changeovers. Distinguish planned set-up from unexpected corrections.
  2. Reject rate: track the product, shift and point at which defects arise. Include a loss only where the link is documented.
  3. Downtime: record its cause, duration and effect on meeting the production plan.
  4. Spare parts: check the availability of required items, the time needed for repairs and the cost of downtime.

This breakdown is useful even if you postpone replacement. It separates losses that can be addressed through operating adjustments from those related to the equipment’s technical condition. Include in the modernisation assessment only costs that the proposed changes could affect.

The scope of the work may differ between plants. Alongside the IS machine, T&T, Turnov s.r.o. supplies a gob feeder, servo stacker and annealing lehr. Include equipment in a combined calculation only if the project will actually change it. Assess the benefit of each change separately.

When to bring modernisation forward

Consider an earlier date if measurements show a difference in consumption and plant records confirm recurring operating losses. This is not an automatic reason to replace the machine. It indicates only that continued operation may change investment priorities. The case for modernisation must also hold up once installation costs and downtime are included.

Prepare data for the technical and financial teams covering the same period and comparable production. Keep measured figures separate from assumptions about the proposed option. The research and development page provides technical context, but does not replace operating measurements. Set out the inputs to the calculation as follows:

  1. Consumption: state electricity in kWh, compressed air in Nm³ and any fuel in the units used for billing.
  2. Production: match consumption to the product range and volume. Use a basis of 1,000 bottles or a tonne of melted glass.
  3. Energy price: use your own contracts and invoices. Label future prices as scenarios.
  4. Operating losses: document adjustments, the reject rate, downtime and parts availability using plant records.
  5. Investment scope: establish installation costs, the required downtime and the planned production programme.

Then compare continued operation with earlier replacement over the same period, using the same production plan for both. Build a timeline for each proposed replacement date: identify when downtime would occur, when consumption would change and which costs would continue until then. Assign expenditure and expected reductions in cost to the periods in which they occur. Do not count a full year’s benefit if the new machine would not be operating for part of that year. Assess any new product range or longer downtime separately. Otherwise, you cannot tell whether the result reflects the technology or different calculation inputs.

Finally, test the result against price scenarios that reflect your contracts and decision-making approach. Repeat the calculation for each replacement date and compare total costs over the chosen period. Record which change in an input assumption would reverse the ranking of the options. The financial team can then account for the time value of money under its own rules and check whether the conclusion depends on a single favourable scenario. These scenarios are not market forecasts. They show the assumptions under which it makes sense to bring modernisation forward and those under which the original date still holds up.

Send us the line’s measured consumption, production plan, contracted energy prices and records of operating losses. As part of a feasibility study, we will assess the line and prepare the information needed to calculate the timing of the modernisation.

About the author

Rolf Themann, MBA

Managing Director, T&T Turnov

Rolf Themann, MBA, is Managing Director of T&T Turnov. He has 42 years of experience in mechanical engineering and R&D, rising from designer to technical director and managing director, and has specialised in container glass machinery for more than 22 years. Today, his focus is on driving down energy consumption and total cost per container across the entire hot end.